Installation options
Vertical or
horizontal
34
The unit offers a variety of installation options, such as vertical or horizontal mounting, flexible
cable routing and flexible air duct connections, making the unit suitable for a wide range of
installation sites. Check the installation options and decide which is most suitable for the
demands on site.
For vertical and horizontal installation, make sure that the condensation drain hose (1) is not
routed into the floor drain, but ends above it.
Fig. 19: Ceiling mounting (left) and wall mounting (right) with condensation drain hose
NOTICE
Before carrying out the installation, please ensure that the ceiling or wall structure is able to
support the weight of the unit.
Make sure to allow for sufficient space for future maintenance work.
INSTALLATION AND SERVICE MANUAL FOR PROFESSIONALS
1
Installation: Installation options