Herunterladen Diese Seite drucken

Hitachi YUTAKI M Bedienungsanleitung Seite 24

Vorschau ausblenden Andere Handbücher für YUTAKI M:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 164
5.2 Outdoor Unit Draining Operation
YUTAKI M has no drain port factory supplied. It is highly recommended to install a drain port valve
attached to the water outlet of the YUTAKI M unit in order to ease the operation of draining. When
the drain port is installed the draining procedure for the YUTAKI M follows the next steps:
1 Switch OFF the main power of the unit.
2 Close the shut-off valve installed at the water inlet connection (field supplied).
3 Connect a pipe or a drain hose to the drain port (field supplied) placed in the water outlet pipe
of the unit.
4 Open manually the drain port of the shut-off valve (field supplied), and collect the water into a
bucket (or to a sewage system)
5 Once all the water has been drained, and all maintenance operations have been finished, close
again the drain port and open again the valve of the water inlet pipe to restart the normal
operation of the unit.
5.3 Hydraulic Connections for YUTAKI M
PMEN0647 rev.0 - 11/2023
5
16

Werbung

loading

Diese Anleitung auch für:

Rasm-2vr2eRasm-3vr2e