Screw vacuum pumps
Table of contents:
1.
Introduction
2.
Application
3.
General Construction
3.1
General
3.2
Construction
3.3
Specifications
3.4
Piping diagram
3.5
Purges
3.5.1
Cooling purge
3.5.2
Sealing purge
3.5.3
Cleaning purge
4.
Handling procedure
4.1
Assembly of piping
4.1.1
Location
4.1.2
Foundation
4.1.3
Installation
4.2
Piping work
4.2.1
Main piping
4.2.2
Cooling water piping
4.3
Connections
4.3.1
V-belt drive
4.3.2
Coupling drive
4.4
Preparation for operation
4.5
Operation
4.6
Stopping
4.7
Lubrication
5.
Maintenance and inspection
5.1
General
5.2
Periodical inspection
5.3
Disassembly
5.3.1
Cautions in disassembly
5.3.2
Disassembling procedure
5.4
Re-assembly
5.4.1
Cautions in re-assembly
5.4.2
Re-assembling procedure
6.
Trouble shooting
Data sheets:
D 830/ 1 ➝ VSA (30), (20)
Spare parts list:
E 830/ 1 ➝ VSA (01)
- 2 -
Page:
3
3
4
4
4
4
5
5
5
5
5
5
5
5
5
5
5
5
5
6
6
6
6
6
6
6
7
7
7
8
8
8
8
8
9
10