4. SCOPE OF DELIVERY
permasolvent primus PT-P25-2.1, consisting of:
•
Pressure body incl. active unit and head with corrosion-resistant coating and easy-to-install
connection technology, incl. flow turbine
•
Connection flange for vertical or horizontal mounting
•
2 connection fittings DN 25 consisting of 2 inserts (one of them with
backflow preventer), 2 union nuts and 2 flat gaskets
•
Venting hose
•
Control electronics incl. Hall sensor
•
External power supply unit (2.5A; 24V)
•
Wall bracket for stable mounting including mounting set
•
Operating instructions and commissioning protocol
primus vital PT-PV25-2.1, consisting of:
•
Pressure body incl. active unit and head with corrosion-resistant coating and easy-to-install
connection technology, incl. flow turbine
•
Connection flange for vertical or horizontal mounting
•
2 connection fittings DN 25 consisting of 2 inserts (one of them with
backflow preventer), 2 union nuts and 2 flat gaskets
•
Venting hose
•
Control electronics incl. Hall sensor
•
External power supply unit (2.5A; 24V)
•
Wall bracket for stable mounting including mounting set
•
Water treatment unit PT-V25
•
Operating instructions and commissioning protocol
permasolvent primus PT-P40-2.1, consisting of:
•
2 pressure bodies incl. active unit and head with corrosion-resistant coating and easy-to-
install connection technology,
•
Connection flange for horizontal installation incl. flow turbine
•
2 connection fittings DN 40 consisting of 2 inserts (one of them with
•
backflow preventer), 2 union nuts and 2 flat gaskets
•
Venting hose
•
Control electronics incl. Hall sensor
•
External power supply unit (2.5A; 24V)
•
Wall bracket for stable mounting including mounting set
•
Operating instructions and commissioning protocol
permasolvent primus PT-P40-2-2.1 consisting of 2 limescale protection systems PT-P40-2.1
mounted on an aluminium stand with each:
65