Herunterladen Inhalt Inhalt Diese Seite drucken

Miele PTD 701 Betriebsanleitung Seite 56

Vorschau ausblenden Andere Handbücher für PTD 701:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
|
|
English
5
Commissioning
Requirements for on-site installation
Inlet water connection
Location
Construction
Inlet water temperature
Water quality
Water hardness
Water flow pressure
Max. inlet pressure
(back pressure)
Flow rate
Limit values for the raw water with PTD 701 AE RO / PTD 702 AE RO
Electrical conductivity
(at 25°C)
Chlorine
Silicate (as SiO
)
2
Waste water connection
Location
Construction
56
approx. 400 mm above finished floor; next to the machine
Isolation valve with G ¾" external thread
Standard
PTD 701 AE RO,
PTD 702 AE RO
Microbiologically, fresh water must be of drinking water quality
Standard
PTD 701 AE RO,
PTD 702 AE RO
Standard
PTD 701 AE RO,
PTD 702 AE RO
1000 kPa (10,0 bar)
min. 4 l/min
< 1200 μS/cm
< 0,2 mg/l
< 30 mg/l
approx. 600 mm above finished floor; next to the machine
Trap on-site
|
11208020/04; 2023-07
max. 60°C
max. 35°C
Machines without integrated
softener
≤ 3 °dH (3.8 °e / 5.34 °TH / 0.54
mmol/l)
Recommended, to prevent ware-
washer from scaling up.
≤ 35 °dH (43.9 °e / 62.3 °TH /
6.3 mmol/l)
100 kPa (1,0 bar)
140 kPa (1,4 bar)
|
Machines with integrated
softener
≤ 31 °dH (37.6 °e /
53.4 °TH / 5.35 mmol/l)
-
Operating instructions

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ptd 701 ae roPtd 701 dosPtd 701 ae ro dosPtd 702Ptd 702 ae roPtd 702 dos ... Alle anzeigen

Inhaltsverzeichnis