Herunterladen Inhalt Inhalt Diese Seite drucken

Zodiac OPEN 3.1 Eignerhandbuch Seite 85

Band 2
Vorschau ausblenden Andere Handbücher für OPEN 3.1:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 335
I-6-1-1- Installation
Present each item of equipment on the deck, lining it up with the holes, without screwing in,
Check that the items of equipment are parallel with each other and the transom,
Use the holes in the console and the bolster to mark the positions of the holes on the deck,
Remove the equipment and drill with a Ø4.2mm bit,
Clean and place SIKAFLEX 221 around each hole and between each hole in order to create a
peripheral seal.
Present the equipment on the deck and screw in.
Clean off the excess SIKAFLEX
Create a peripheral finishing seal on the internal section of the console to ensure better
waterproofing.
613770 A
DESCRIPTION – INVENTORY and location
Page 17 / 65
Peripheral finishing
seal
Edition 2
E
N
G
L
I
S
H

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Open 3.4Open 4.2Open 4.8

Inhaltsverzeichnis