Herunterladen Inhalt Inhalt Diese Seite drucken

Winkhaus blueMotion Montageanleitung Seite 169

Vorschau ausblenden Andere Handbücher für blueMotion:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Installation, Operating and
Maintenance Instructions
Notice: The positioning of
frame power supply and
cable transition on the hinge
side is recommended, either
between lower / middle door
hinge or in each case approx.
10 cm above / below the
middle door hinge.
Figure 3.8.2-4: Wiring blueMotion with
App and frame power supply
Aug. Winkhaus GmbH & Co. KG ∙ Berkeser Straße 6 ∙ 98617 Meiningen
T +49  369  3950 - 0 ∙ www.winkhaus.de ∙ Subject to technical changes
blueMotion
green / yellow = input for external
Notice!
Description
Set of cable transition
T-SET KÜ-T1 FT INTEG-
BM 3,5 + 1,5 M EST inclu-
ding housing EV-G + cover
plate (depends on the
faceplate / material type),
plug-in
Cable transition frame
part T-KÜ-T1 RT KABEL
0,6M RNT, for frame power
supply
T-BM ... including motor
housing
230 V AC
Frame power supply
T-NETZTEILRAHM. 24 V
DC 1 A (2 A/2 S)
to
Arte micro plus with App
round face plate 20 mm
square face plate 24 mm
ekey KAB BM + 0,3 m /4 x 0,25
CP / PAP4 WHS BMO, Connection
from ekey home SE micro plus to the
WH external control unit
Fingerprint ekey FS AR ED V 52 x 52
Control unit ekey home SE micro
plus 1
ekey KAB AA 4 m / 5 x 0,14 SH / CP35,
Connection from ekey fingerprint
AR to control unit ekey home SE
micro plus
fingerprint ekey Arte micro plus with
(sash side)
65
white + 24 V DC
brown 0 V
}
external opening
green
signal
yellow
grey
pink (not assigned)
potential-free contact
(e.g. unlocking via inter-
com / "open" button)
max. 40 m extendable
(min. 5 x 0,8 mm
)
2
ekey WH-BM Set,
5044745
EN
3
Art.-No.
5040512
5040504
on
request
5038589
ekey
101945
101948

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis