Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance Plan - Nussbaum ATT TOP LIFT 2.35 TS Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 7
7.1

Maintenance plan

i
Before beginning service, disconnect from power. The work area around the lift is to be secured against
unauthorised use.
Visual
Spray
inspection
Time frame
Maintenance
type position
12
11
1
2
10
365 x / 12
9
3
4
8
5
7
6
12
1
11
2
10
365 x / 12
9
3
4
8
5
7
6
12
1
11
2
10
365 x / 12
9
3
4
8
5
7
6
12
1
11
2
10
1 x / 12
9
3
4
8
5
7
6
12
11
1
2
10
1 x / 12
9
3
4
8
7
5
6
12
11
1
2
10
1 x / 12
9
3
4
8
5
7
6
OPI_TOP LIFT 2.35 TS TSK TSA - HYMAX INGROUND 2.35 R B P_V1.1_DE-EN-FR-ES-IT
Oil
Lubricate
Model and information signs, labels, brief operating instructions,
safety stickers and warning information are to be cleaned and ex-
changed if damaged.
Check the foot bumper for condition and function. Exchange if dam-
aged
(only for the version with foot deflector)
The rubber acceptance plate is to be checked for wear and replaced
if necessary.
(only for the version with lifting arms)
Check the lifting arm block and gear for wear. Exchange if there is
visible damage.
(only for the version with lifting arms)
Lifting arm booms, lifting arm bolts, carrier plate threaded bolts are
to be checked for ease of running. If required, lightly grease with
multi-purpose grease. Do not over-lubricate.
(only for the version with lifting arms)
All weld seams must have a visual inspection. Stop the system and
contact the manufacturer if there are cracks or breaks in weld seams
of the lift.
Clean with
compressed
Clean
air
Maintenance plan
Inspect
77

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis