Herunterladen Diese Seite drucken

Novoferm 45-4 Serie Montage-, Bedienungs- Und Wartungsanleitung Seite 10

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 3
GB
( 1 )
Pad angle frames 1
R
protection against scratching). Assemble angle frame 1
frame panel 3 + angle frame 1
assembled)
[
]
[
1.10 a
4
/4
to header angle with S11
R
L
( 2 ) Position and attach wall anchors 7 to angle frames 1
with S6 + S12 in accordance with width of side room/
headroom and wall/dowel conditions.
( 2a )
Width of side room/headroom greater than
120mm: position wall anchors 7 outwards
( 2b )
Width of side room/headroom 45 - 119mm
position wall anchors 7 inwards
Should you use mounting/installation materials other
than the included materials, ensure that the material
can bear at least the same load as the wall anchors 7
supplied.
Door frame installation [1.15],
( 3 ) Rest door frame against garage open, secure against
tipping, use mason's level to align sections exactly parallel
and square. centre and clip panel retainers 13 to panel 3. 2
panel retainers are included with doors wider than
3530mm. Mount complete angle frames with S8 + S9
. Warning: Do not twist or bend angle frames
]
[
]
b, c, d
2.10 b
1
/1
; if necessary pad with wood before tightening
R
L
screws.!!! Type VL: observe 5mm minimum spacing
between upper frame edge and garage ceiling!!!
Horizontal track pairs pre-assembly [1.20],
( 4 ) Assemble right 14
or left 14
R
piece 16
/16
+ connecting plate 18 using (S6 + S12)
R
L
. Twist of track bracket 19 [
]
b
castings-VL 20
/20
R
plate bracket-HL 21
R
.
[
]
2.10 d, e, f
Horizontal track pair installation [1.25],
( 5 ) Mounting anchor rails 27
For garage inner width of max. door width +
( 5a )
1030mm (centre installation): insert one anchor
rail 27 left and one anchor rail right into the
track connector 6 fasten with plate 29 and
connecting bracket 28 using S6 + S12. Rails
must remain extractable
( 5b )
Mount track connectors 6 to the garage ceiling if
garage inner width is larger than door width +
1030mm as well as when installing HL type doors.
( 6 ) Fasten horizontal track pairs 14
end 16
/16
so that the assembly can be folded upward
R
L
. Depending on door opening assemble as follows:
[
]
1.25 b
Width of side room/headroom 45 - 119mm: Fasten
S13 with S12 loosely. Insert S13 through the square
punch out on tail end 16
and turn 90°, so that the square snaps into the punch
out in the angle frame 1
Width of side room/headroom greater than 120mm:
Insert S5 through square punch out in tail end 16
and insert in header angle and tighten finger tight with
S12.
( 7 ) Connect track connector 6 with two S6 + S12 each to
corner castings-VL 20
The instructions for installation, operating and maintenance must be kept in a safe place as long as the door is in use!
/1
with wood or similar material (as a
L
(sheet metal screws pre-
L
. Screw Sole plate bracket-VL
]
2.10 a
.
[
]
1.10 b
[
1.10 db
[2.10]
[2.10]
horizontal track pair with end
L
]. Assemble corner
1.20 ca, cb
(S6 + S12)
Assemble sole
[
].
1.20d
L
/21
+ profile bracket 100 (S6 + S12)
L
[2.10]
.
[
]
1.25 aa, ab
/14
to header angle at tail
R
L
/16
connect to header angle
R
L
/1
. Tighten S12 finger tight.
R
L
/20
.
[
]
Connect track
1.25
c
R
L
connector 6 with two S6 + S12 each with sole plate
+
bracket-HL 21
R
Hanging horizontal track pairs [1.30],
( 8 ) Lift up horizontal track pairs 14
dropping (support track connector 6 carefully).
/1
R
L
( 9 ) Connect track bends 30 with S6 + S12 to angle frames
1
/1
R
profiles carefully; the joints must be smooth and level;
adjust track bends cautiously , if necessary).
.
[
]
1.10 da
( 10 ) Connect tail ends 16R/16L to header angle with screw
]
S11. [
( 11 )
Connect upper deflection pulley bracket-HL 101
through header angle with tail end 16
profile bracket 100 using screw S11
( 12 ) Align track connector 6 and horizontal track pairs 14
with mason's level and mount to wall or ceiling. Do not fully
tighten screws to allow later adjustment and alignment.
( 12a )
( 12b ) Ceiling fastening: anchor rail 27 + connecting
[
1.15 a,
Mount track bracket 19 together with anchor rail 27 +
connecting bracket 28 + S6 + S12 + S8 + S9 to ceiling
[
1.30e
3530mm
2126mm: mount additional ceiling brackets to track
[
1.20 a,
pair 14
rails 27 + connecting bracket 28 + clip plate 29 + S6 +
S12 + S8 + S9)
Mounting torsion spring [1.35];
( 13 ) Insert pre-assembled right torsion spring 35
plate bracket 4
centre bearing 37 (S8 + S9)
Insert 2 screws S5 through clip plates 29 to track connector
6. Pre-assemble centre bearing 37 and sole plate 103 with
S6 + S12 and connect with S12 to the clip plates 29.
. Insert pre-assembled right torsion spring 35R into sole
]
db
plate bracket-HL 21
Mount ceiling bracket to centre bearing 37 (anchor rails 27
+ connecting bracket 28 + S6 + S12 + S8 + S9) [
For doors with a co-ordinating width of up to 3529mm:
mount 1 centre bearing 37 (a>120mm).
For doors with a co-ordinating width larger than 3530mm:
mount 2 centre bearings 37. Follow above instructions to
assemble left torsion spring. Align centre bearing
precisely to ensure that springs run smoothly. Insert
coupling 38 to shaft end and mount left torsion spring 35
analogue to right torsion spring 35
shaft ends and slightly tighten by hand [
Installing door leaves [1.40]; [1.45]; [1.50]; [1.55]; [2.20].
( 14 ) Floor section 44 (B)
( 14a )
/16
R
L
( 14b ) Connect 1 external hinge 48
( 14c )
- 8 -
/21
.
[
]
2.10 f
R
L
and connecting plates 18
L
]
1.30 a
Wall fastening VL: dowel connecting bracket 28
+ S8 + S9
[
1.30 b].
bracket 28 + S6 + S12 + S8 + S9
Use additional diagonal braces if problems with
stability arise
[
]
[
1.30 d
;
2.15 c
. Warning: co-ordinating width greater than
]
and
co-ordinating
/14
as well as to track connector 6. Anchor
R
L
[
]
1.30 f
[2.15]
and fasten with S11
R
[
/21
and connect with S11.
R
L
Insert floor seal 47 in floor guide and add rubber
stoppers 45
/45
[
].
1.40a
R
L
right to the floor section 44 with S15 [
centre hinge 68 to floor section wirt S16 [
Before placing the floor section 44 clean the
sealing of angle frames 1
. Place floor section 44 between angle frames
[
]
1.30
[2.15]
/14
and support against
R
L
(align track
[
];
[
]
1.30 a
2.15 a
/101
R
/16
as well as with
R
L
[
]..
2.15 a
/14
R
[
]
[
]
1.30 c
;
2.15 b
.
]
height
greater
than
to sole
R
. Mount
[
]
1.35 aa, ab
].
1.35 b, da, db
[
2.15 da,
[
2.15 e, f
].
2.15g
. Slide coupling 38 over
R
];
[
].
1.35 c
2.15 h
/48
both left and
R
L
]. Screw
1.40c
].
1.40 b
/1
with a damp cloth
R
L
L
L
.
.
]
L

Werbung

loading