Herunterladen Diese Seite drucken

Preparing Pool Water; Installation Of Chlorine Generator; Installation Of Control Box - ubbink SaltControl Installation Bedienung

Salzwasserelektrolyse pool wasseraufbereitung

Werbung

Gerätes. Kinder sind zu überwachen um sicherzustellen, dass sie nicht mit dem Gerät spielen.
Verwendung
Verwendung
Operating Manual
1
The use of dry acid (sodium bisulfate) to adjust pool pH is discouraged especially in arid regions where pool
• Die Pumpen sind bestimmt für den Betrieb in Verbindung mit Schwimmbeckeneinrichtungen, z.B. Filterung.
• Die Pumpen sind bestimmt für den Betrieb in Verbindung mit Schwimmbeckeneinrichtungen, z.B. Filterung.
Installation
Installation
INSTALLATION
• Die Pumpe ist horizontal zu installieren, befestigt mit Bolzen auf einem fi xierten und festen Fundament um unerwünschte Geräusche und Vibrationen zu verhindern.
Remove power to the pool filter pump before starting this installation. Installation must be performed in accordance with Local and NEC codes. The Control Box must be mounted a
• Die Pumpe ist horizontal zu installieren, befestigt mit Bolzen auf einem fi xierten und festen Fundament um unerwünschte Geräusche und Vibrationen zu verhindern.
• Stellen Sie die Pumpe so nahe wie möglich neben dem Becken auf. Schaff en Sie den für weitere Inspektionen und Wartung erforderlichen Freiraum um die Einheit und unter der
minimum of 3.5 meters (12ft.) horizontal distance (or more, if local codes require) from the pool, within 2 meters (6.5 ft.) from a protected outlet, and within 4.5 meters
Einheit. Die Pumpe soll über ein Fehlerstromschalter (FI - Schalter) mit einem Fehler-Nennstrom von nicht mehr als 30 mA versorgt werden.
(15 ft.) from where the Cell will be installed. Take care to protect the Cell cap connector pins while handling the chlorine generator unit during installation.
• Die Pumpensaugleitung sollte nicht kleiner als die Druckleitung sein. Alle Leitungen müssen luftdicht sein.
• Die Pumpengewinde sind mit Tefl onband abzudichten, wenn die Pumpenverbindungen angeschraubt werden. Die Pumpenverbindungen sind nur so fest anzuziehen wie es für
eine dichte Verbindung erforderlich ist. Übermäßiges Festziehen ist unnötig und könnte zu Schäden an der Pumpe führen.
• Das Gewicht der Leitungen sollte separat unterstützt und nicht von der Pumpe aufgenommen werden.
Filter
Manual Poolmax.indd 2
Filter
pump
From Pool

Preparing Pool Water

Before attempting to operate chlorine generator, pool water must be checked, the pool's chemistry must be balanced and salt must be added. This must be done BEFORE activating the
chlorine generator. Some adjustments to your pool chemistry may take several hours, so start the procedure well before you intend to operate
the chlorine generator.
Adding Salt: Add salt several hours or, if possible, 1 day prior to operating the chlorine generator. Take care not to exceed the recommended salt level. Measure salt 6-8 hours after
adding to the pool.
NOTE: If the pool does not have new water, add 1 liter of metal remover and 1 liter of non-copper based algaecide to the pool, per manufacturer's instructions. This ensures a quick,
trouble free transfer to the chlorine generator system.

Installation of Chlorine Generator

Follow the step by step instructions located on the Installation Quick Start Guide. Refer to the following sections for more detailed information.

Installation of Control Box

The Chlorine generator is contained in a rain tight enclosure that is suitable for outdoor mounting. The Control Box must be mounted a minimum of 3.5 meters (12 ft.) horizontal dis-
tance (or more, if local codes require) from the pool, within 2 meters from a protected outlet, and within 4.5 meters (15 ft.) from where the Cell is installed. The Control Box is designed
to mount vertically on a flat surface with the cables facing downward. Because the enclosure also acts as a heat sink (disperses heat from inside the box), it is important not to block
the four sides of the Control Box. Do not mount chlorine generator inside a panel or tightly enclosed area. Before securing the Control Box to the intended location, make sure that the
power cord will reach the protected outlet and that the Cell cable will reach the location where the Cell Vessel will be installed. Use the included Mounting Template to position the
fasteners to the mounting surface. Refer to the diagram below.
Secure Mounting template to desired
mounting location and drill mounting
holes.
INSTALLATION
Protected
outlet
2 meters
(6.5 ft.)
Solar Heater
4.5 meters
(15 ft.)
Flow
direction
Cell Vessel
·
Preparing Pool Water
Before attempting to operate chlorine generator, pool water must be checked, the pool's chemistry must be
balanced and salt must be added. This must be done BEFORE activating the chlorine generator. Some
adjustments to your pool chemistry may take several hours, so start the procedure well before you intend to operate
the chlorine generator.
4
Adding Salt: Add salt several hours or, if possible, 1 day prior to operating the chlorine generator. Take care not to
exceed the recommended salt level. Measure salt 6-8 hours after adding to the pool.
NOTE
: If the pool does not have new water, add 1 liter of metal remover and 1 liter of non-copper based algaecide
to the pool, per manufacturer's instructions. This ensures a quick, trouble free transfer to the chlorine generator
system.
Installation of Chlorine Generator
Follow the step by step instructions located on the Installation Quick Start Guide. Refer to the following sections for
more detailed information.
Installation of Control Box
The Chlorine generator is contained in a rain tight enclosure that is suitable for outdoor mounting. The Control Box
must be mounted a minimum of 3.5 meters (12 ft.) horizontal distance (or more, if local codes require) from the pool,
within 2 meters from a protected outlet, and within 4.5 meters (15 ft.) from where the Cell is installed.
The Control Box is designed to mount vertically on a flat surface with the cables facing downward. Because the
enclosure also acts as a heat sink (disperses heat from inside the box), it is important not to block the four sides of
the Control Box. Do not mount chlorine generator inside a panel or tightly enclosed area.
Before securing the Control Box to the intended location, make sure that the power cord will reach the protected
outlet and that the Cell cable will reach the location where the Cell Vessel will be installed. Use the included
Mounting Template to position the fasteners to the mounting surface. Refer to the diagram below.
Required for the installation
Drill
up
Control
BOX
Mounting
Template
TO Pool
2
Optional
vertical
installation
Drill bit 5/32"
Fix the controller box on the wall,
put the gaskets on the screws,
and fasten the screws into the
holes.
3
5
Star bit
Screw in bottom fasteners
securely.
24-03-2009 17:18:43

Werbung

Kapitel

loading

Diese Anleitung auch für:

Saltcontrol pool