Herunterladen Inhalt Inhalt Diese Seite drucken

baltur BT 250 DSG Betriebsanleitung Seite 27

Vorschau ausblenden Andere Handbücher für BT 250 DSG:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 59
Pump axis
SIPHON FEED SYSTEM WITH FEED FROM THE TOP OF THE TANK
1 Tank
3 Wire-net filter
4 Pump
6 Suction pipe
7 Return pipe
10 Bottom valve
TABLE OF PIPELINE
FOR BT 300 DSG - BT 350 DSG
GRAVITY FEED SYSTEM
1 Tank
6 Suction pipe
2 Feeding pipe
7 Return pipe
3 Wire-net filter
8 Automatic fuel interception
4 Pump
5 Degasifier
9 Non-return valve
8 Automatic fuel interception
1 Tank
3 Wire-net filter
9 One-way valve
4 Pump
10 Bottom valve
6 Suction pipe
7 Return pipe
Pump axis
SUCTION FEED SYSTEM
Pump axis
N.B. Comply with existing
regulations regarding apparatus
required in the pipeline system
H - Height difference between minimum fuel tank level and pump axis.
L - Total length of pipeline, including vertical lenght. Subtract 0,25 mt.
for every elbow or gate valve.
26
device at burner shut off
H
meters
1
1,5
2
2,5
3
device at burner shut off
H
meters
1
1,5
2
2,5
3
Dimension P = 3,5 m. (max.)
H
meters
0,5
1
1,5
2
2,5
3
3,5
Total length meters
Ø = 3/4"
Øi. 20 mm
40
40
45
45
45
45
50
50
50
50
Total length meters
Ø = 3/4"
Øi. 20 mm
40
40
45
45
45
45
50
50
50
50
Total length meters
Ø = 3/4"
Øi. 20 mm
34
34
29
29
24
24
19
19
14
14
9
9
3,5
3,5

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis