Page 9 of the General Building Inspectorate Approval no. Z-40.11-280 dated 30 January
5.3
Tests
5.3.1
Performance tests / Testing before commissioning
(1) After installing the tanks and the corresponding pipelines and safety devices, a performance
test is required. It consists of visual inspection, a leak test, testing the filling, ventilation and
suction lines and the
(2) The performance test does not replace a required test before commissioning by a specialist
for water regulations; however, the two can be performed together.
5.3.2
Ongoing tests / Tests after commissioning
(1) The operator must examine the tanks visually for leakage at least once per week. As soon
as leakage is discovered, the unit must be taken out of operation and the damaged container
emptied.
(2) The functionality of the leak detector must be tested according to the specifications of the
usability certificate issued for it by the building inspectorate.
(3) Tests required by other directives are not affected by this.