Herunterladen Inhalt Inhalt Diese Seite drucken

CEMO DWT Transport-, Montage- Und Betriebsanleitung Seite 77

Cemo-sicherheitstank
Vorschau ausblenden Andere Handbücher für DWT:
Inhaltsverzeichnis

Werbung

D E U T S C H E S I N S T I T U T F Ü R B A U T E C H N I K
of the General Building Inspectorate Approval dated 30 January 2001
Approval number:
Applicant:
Object of the approval:
Validity period extends until:
This notification extends the period of validity of the General Building Inspectorate
Approval No. Z-40.11-280 dated 30 January 2001, amended and supplemented by the notification
dated 20 July 2001. This notification consists of one page. It is valid only in conjunction with the
aforementioned General Building Inspectorate Approval and may be used only in conjunction with
said approval.
Leichsenring
(German Institute for Structural Engineering)
An institution of public law
Notification
of
the extension of the period of validity
Z-40.11-280
CHEMOWERK GmbH
In den Backenlaendern 5
71384 Weinstadt
Germany
Double-walled tanks made of GRP,
1000 I, 1300 I, 1500 I, 2000 I and 2350 I,
Type „DWT"
31. January 2011
10829 Berlin, 26 June 2006
Kolonnenstrasse 30 L
Telephone: +49 (0)30 78730- 338
Fax: +49 (0)30 78730-320
Ref. No.: 51-1.40.11-42/06
Authenticated
GB
77

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis