Herunterladen Inhalt Inhalt Diese Seite drucken

CEMO DWT Transport-, Montage- Und Betriebsanleitung Seite 78

Cemo-sicherheitstank
Vorschau ausblenden Andere Handbücher für DWT:
Inhaltsverzeichnis

Werbung

GB
D E U T S C H E S I N S T I T U T F Ü R B A U T E C H N I K
of the General Building Inspectorate Approval dated 30 January 2001
Approval number:
Applicant:
Object of the approval:
Validity period extends until:
This notification amends and supplements the General Building Inspectorate Approval No. Z-40.11-280
dated 30 January 2001. This notification consists of four pages. It is valid only in conjunction with the
aforementioned general Building permit and may be used only in conjunction with said permit.
78
(German Institute for Structural Engineering)
An institution of public law
Notification
of
the extension of the period of validity
Z-40.11-280
CHEMOWERK GmbH
In den Backenlaendern 5
71384 Weinstadt
Germany
Double-walled tanks made of GRP,
1000 I, 1300 I, 1500 I, 2000 I and 2350 I,
Type „DWT"
31 January 2006
10829 Berlin, 26 June 2006
Kolonnenstrasse 30 L
Telephone: +49 (0)30 78730-338
Fax: +49 (0)30 78730-320
Ref. No.: 51-1.40.11-42/06

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis