Herunterladen Inhalt Inhalt Diese Seite drucken

Task 2: Installing The Lcd Panel (Optional) - Promise Technology VessRAID series Kurzanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 37
Figure 2. VessRAID 1730i rear view
Figure 3. VessRAID 1830i rear view
For a description of the LEDs, see pages 18 and 19.

Task 2: Installing the LCD Panel (Optional)

The LCD panel mounts to the left ear of the VessRAID enclosure.
1.
Align the connector on the left bracket of the VessRAID enclosure to the
connector on the back of the LCD panel, as shown in Figure 4.
Power Supply
Power Supply
The LCD panel is NOT a hot-swap device. Be sure the
VessRAID is powered down before you connect or disconnect
the LCD panel.
You must install the LCD panel before you mount the
VessRAID subsystem in a rack.
Task 2: Installing the LCD Panel (Optional)
RAID Controller
RAID Controller
Cautions
5

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis