Putting the sensor into operation

User qualification: trained user, see
n
CAUTION!
Incorrect metering due to sensor failure
Possible consequence: Slight or minor injuries. Material damage.
If a sensor fails then there may be an incorrect measured value at the input of the
measuring/control unit.
This incorrect measured value can lead to uncontrolled metering.
The operator should therefore ensure that no subsequent damage results from this.
CAUTION!
Incorrect metering due to premature ageing of the sensor
Possible consequence: Slight or minor injuries. Material damage.
Measure: Do not electrically disconnect the sensor during measuring breaks.
Exception: If there is a break between measurements lasting more than a week and the pro‐
portion of disinfectant in the sample water falls during this period to 0 ppm then electrically
disconnect the sensor.
An extra run in period will be necessary following operation without disinfectant. Switch
on the feeder assembly with a time delay if necessary.
Run in period
The sensor requires a specific run in period to display a steady display value.
Initial commissioning:
Recommissioning:
Electrolyte or diaphragm replacement:
* the exact run in period depends on the application.
Putting the sensor into operation
Ä Chapter 1.2 „User qualification" on page 10
6 ... 12 h
3 ... 6 h
6 ... 12 h
23