Herunterladen Inhalt Inhalt Diese Seite drucken

Instructions Prior To Installation; Installing The Boiler; Contents Of Pack; Accessories - Baxi luna platinum+ Gebrauchsanleitung

Vorschau ausblenden Andere Handbücher für luna platinum+:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

INSTRUCTIONS PRIOR TO INSTALLATION

igniting and using the boiler are contained in the "Instructions for Users" section. The installation must satisfy the requirements of
This boiler can be connected to any type of double- or single-pipe convector plate, radiator or fancoil unit. Design the system
sections as usual, though, bearing in mind the available capacity-head at the plate (see annex "SECTION" E at the end of this
manual).
Initial ignition of the boiler must be carried out by the Authorised Service Centre, as indicated on the attached sheet.
ADDITIONAL PUMP WARNING
SOLAR CIRCUIT WARNING
ADJUSTING THE TEMPERATURE OF THE HIGH TEMPERATURE HEATING SYSTEM: to avoid frequent starting and stopping,
the procedure described in section 14.2.1.
TEMPERATURE ADJUSTMENT ON LOW TEMPERATURE HEATING SYSTEM
Failure to observe the above will render the warranty null and void.

12. INSTALLING THE BOILER

The template outline is shown in annex "SECTION" C at the end of this manual.
Avoid horizontal stretches.

12.1 CONTENTS OF PACK

Template
Boiler support bar
Gas tap (1) and Water inlet tap (2)
Telescopic joints (3)-(4)-(5)-(6)-(7)

ACCESSORIES

7219836.01 (1-04/15)
42

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis