General
DANGER!
Risks when commissioning equipment which has been damaged during
transportation.
Installation or start-up must not take place if any transport damage is detected
when unpacking the system.
Installing/starting up a damaged pump may result in uncontrollable errors,
which may lead to irreparable damage to personnel and/or of the equipment
when using aggressive dosing agents.
Transport inspection
NOTICE!
Check the delivery for completeness and any transport damage.
In case of visible transport damage, proceed as follows:
n
Do not accept the delivery or accept it only on a provisional basis.
n
Note down the extent of damage on the transport documents or on the carrier's
delivery slip.
n
Lodge a complaint.
Claim for any damage as soon as you notice it!
Damage claims can be filed only within the applicable period for complaints.
1.3
Packaging
The individual packages are bundled to suit the expected transport conditions.
Only environmentally-friendly materials have been used in the packaging.
The packaging is designed to protect the individual components against shipping damage,
corrosion and other damage before assembly.
Do not destroy the packaging and only remove it just before assembly.
There may be instructions on how to handle the packages (e.g. this way up,
fragile, keep dry). These must be adhered to accordingly.
ENVIRONMENT!
Risk of environmental damage from incorrect disposal!
Packaging materials are valuable raw materials and can, in many cases, be
used again or be usefully processed and recycled.
Incorrect disposal of packaging materials can be a threat to the
environment.
– Observe the local disposal regulations!
– Environmentally-friendly disposal of packaging materials.
– If necessary, hire a specialist to carry out disposal.
MAN050481 Ver. 04-06.2024
8