Herunterladen Diese Seite drucken

Codan IBPM DPT-6000 Gebrauchsanweisung Seite 53

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

IBPM
DPT-6000 (DPT-6003 & DPT-6009)
DPT-9000 / Xtrans
9.3
Patient connection
Before using the pressure monitoring set on a patient, make sure that all the vented protective caps have been disposed
9.3.1
of and replaced with non-vented protective caps (see section 4.4, page 44 – Consumables). Vented protective caps
may allow the ingress/leakage of liquids, air and/or pathogens.
Connecting a pressure monitoring set to an unsecured patient access port can lead to uncontrolled bleeding, a severe
9.3.2
drop in blood pressure and the need for a blood transfusion. Before connecting a pressure monitoring set, make sure that
the patient access port is closed to prevent uncontrolled bleeding and to guarantee safe initial use.
1
CLC
SWAN
A–Y
9.3.3
VIII
NBSS
NBSS
XL
ABSS
ABSS
XL
A–F
VIII
Before transporting or repositioning the patient, the roller/sliding clamps of the fi lling and fl ush system should be closed,
9.3.4
since otherwise air can get into the patient's circulatory system via the tubing system and this can lead to an embolism. The
user must ensure that the entire pressure monitoring set is free of air pockets for the duration of its use.
Depending on the confi guration of the pressure monitoring set and the therapy of the patient's individual medical condition/disease,
9.3.5
the pressure monitoring set can be connected to one or more vascular access ports in different regions of the body (see section 3.7,
page 40 – Type and duration of intended physical contact).
10
Zero calibration
For correct zero calibration, follow the instructions below.
1
CLC
SWAN
A–Y
10.1
IV
NBSS
NBSS
XL
ABSS
ABSS
XL
A–F
IV
At the start of a shift, after every change in the positioning height of the pressure transducer or patient, and after any
10.2
interruption in signal transmission between pressure transducer and control monitor (e.g. due to a power failure or change
of electrical accessory), another zero calibration must be performed to ensure accurate pressure monitoring.
If, during zero calibration, saline solution leaks from the lateral duct of the 3-way zeroing stopcock without the fl ush
system being operated, the pressure monitoring set must be inspected and replaced with a new one if required because
10.3
this is indicative of uncontrolled fl ushing due to a defective fl ush system (see section 19, page 63 – Replacing the
pressure monitoring set/sterile accessories).
11
Transmission quality check
To check the transmission quality, follow the instructions below.
11.1
Square wave test
CLC
SWAN
A–Y
IV
11.1.1
NBSS
NBSS
XL
ABSS
ABSS
XL
A–F
IV
20.1028.00/2022-10
(DPT-9003 & DPT-9009)
®
2
9.3.1-.2
2
2
1
2
3
1
3
1
10.2.-3
± 0
3
1
9.3.4-.5
2
1
2
11.1.2
53

Werbung

loading

Diese Anleitung auch für:

Ibpm dpt-6003Ibpm dpt-6009Ibpm dpt-9000Ibpm dpt-9000 xtransIbpm dpt-9003Ibpm dpt-9009