– New start-up after flushing, malfunction or temporary shut-down.
– Putting the metering station into operation after flushing/maintenance
– Putting the metering station into operation after fault rectification
– Putting the metering station into operation after an extended standstill
6.2
Operation
WARNING!
When replacing the containers, it must be ensured that there is no wrong
choice of a metering medium or additive, as only the authorised metering
media can be used and the system may be endangered or destroyed by other
media.
After the metering station has been correctly put into operation, you can use the metering
station during daytime operation. This chapter describes how to proceed in daytime mode
and the points you need to be aware of.
Daytime operation includes the following tasks:
n
Switching the metering station on and off
n
Switching the pump on and off
n
Select the operating mode for the metering pump
n
Starting and stopping the metering pump
Putting the metering station into functional operation
n
n
Monitoring the operation of the metering station
Commissioning / operation
41
MAN048084 Rev. 02-03.2024