Herunterladen Inhalt Inhalt Diese Seite drucken

Switch Off The Pump; Recommissioning - Elmo Rietschle V Serie Originalbetriebsanleitung

Vorschau ausblenden Andere Handbücher für V Serie:
Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

6.6

Switch off the pump

Shutdown
1
• To switch off, the pump must be shut down from the application and secured against being switched
on again. In addition, a warning sign must be attached to the mains isolating device.
• All electrical equipment must be individually disconnected. Maintenance and servicing activities are
strictly prohibited during operation or when the pump is switched on
2
Disconnection from the power supply
• A qualified electrician switches the motor off and disconnects it. After carrying out the 5 safety rules,
non-qualified electricians may also carry out work on the pump.
• After completing the activities, follow the instructions in the chapter 6.7.
6.7

Recommissioning

After the storage and shutdown period, the pump must be checked to ensure that it is operational. If it is not
operational, appropriate maintenance and servicing measures must be carried out to restore its operational
capability.
The following points must be worked through in the specified order to enable the pump to be safely
recommissioned:
1.
The pump must be maintained, cleaned and, if necessary, repaired in accordance with the chapters
8.1 and 8.9.
2.
The electrical connection must be carried out in accordance with the chapter 6.3. The power supply
must not yet be restored.
3.
All safety devices must be fitted and checked for functionality and effectiveness. Damaged parts
must be replaced immediately
After completing the above points and taking into account the section „Switching on the pump", see chapter
6.4, the pump can be put back into operation.
Prematic AG, Märwilerstrasse 43, 9556 Affeltrangen www.prematic.ch
INSTALLATION AND COMMISSIONING
www.elmorietschle.com © Gardner Denver Schopfheim GmbH
Tel. 071 918 60 60, Mail: v-g@prematic.ch
23
|

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

V-vtr 61V-vtr 81V-vtr 101V-vtr 141

Inhaltsverzeichnis