Herunterladen Inhalt Inhalt Diese Seite drucken

Cleaning & Maintenance - Maico DAQ/Ex Serie Montage- Und Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 4
EN
3-
Mains
56 –
1
M20x
phase
con-
71
1.5
nection
1-
Sec-
56 -
1
M20x
phase
ondary
71
1.5
con-
nection
• An adapter can be supplied and fitted for devi-
ating connections and other threads of the ter-
minal box. The adapter must be certified ac-
cording to EN 60079-0 and EN 60079-1 or EN
60079-7.
The table below shows the torques for the cable
entries:
Metric
NPT
Permiss-
ible cable
width
range [mm]
M12x1.5
2 - 5
M12x1.5
3 - 6.5
M16x1.5
NPT 3/8"
3 – 7
M16x1.5
NPT 3/8"
5 – 10
M20x1.5
NPT 1/2"
10 – 14
M20x1.5
NPT 1/2"
7 – 12
M25x1.5
NPT 3/4"
9 – 16
M25x1.5
NPT 3/4"
13 – 18
M32x1.5
NPT 1"
14 - 20
M32x1.5
NPT 1"
18 – 25
M40x1.5
NPT 1 1/2"
20 - 26
M40x1.5
NPT 1 1/4"
20 – 26
M40x1.5
NPT 1 1/2"
22 – 32
M40x1.5
NPT 1 1/4"
22 – 32
Circuit diagram 3-phase with PTC thermistor trig-
gering system
3. Wire the unit electrically, install the PTC ther-
mistor triggering system according to the rel-
evant circuit diagram → Circuit diagram.
Every unused core line, in multi-core cables,
must either be connected to earth at the end
in potentially explosive atmospheres or be
adequately insulated by terminals suitable for
the type of ignition protection. Insulation with
insulating tape alone is not permitted (EN
60079-14).
Fit terminal box cover for explosion protec-
tion. Ensure that there are no dirt particles in
the terminal box and that the seal of the ter-
minal box cover has close contact all the way
around the terminal box. Please refer to the
following table for tightening torques.
Thread
M4
M5
M6
Tightening
2
3.2
5
torque [Nm]
12
4. If necessary, fit an on/off switch (provided by
½"-
M4
the customer).
NPT
17.3 Earthing of the unit and duct
½"-
M4
system
NPT
Properly earth units, installed in outdoor
areas, in accordance with IEC
60364-5-54:2011. Take into consideration the
requirements of earthing systems, PE con-
ductors and protective bonding conductors.
Attach a conductor eye to the PE conductor
and screw it down properly to the unit hous-
ing so that they have stable electric continuity
and sufficient mechanical protection and
Nm
strength. Ensure equipotential bonding be-
fore commissioning the unit.
1. Securely screw down the earth conductor to
the unit housing (tightening torque 10 Nm).
7.5
2. Ensure equipotential bonding before commis-
7.5
sioning the unit.
9
3. Connect PE conductor at mains end in ter-
9
minal box with explosion protection.
10
4. Connect PE conductor duct system to ter-
minal on outside of unit.
10
12
17.4 Direction of rotation and air
12
flow direction
15
The direction of rotation is marked on the
15
motor. The air is sucked in via the inlet nozzle
24
and blown out via the air outlet.
24
17.5 Checking electrical connection
24
1. Perform the following checks: D = detailed
24
check, N = close inspection, S = visual in-
spection
Test schedule
I
Screws, cable glands (direct and
indirect), blanking plugs are of
the correct type, complete and
sealed.
II Cable and line type appropriate
for the purpose.
III No visible damage on cables
and lines.
IV Cable screw connections in ac-
cordance with standard EN
60079-1 (Ex "d") must be used.
V The ignition transmission pre-
vention passages must be free
of dirt and damage and greased
(AGIP GR NS 4 or equivalent).
VI Electrical connections secure.
VII Unused connection terminals
tightened.
VIII Insulation resistance (IR) of mo-
tor windings satisfactory.
IX Earth connections, including any
additional equipotential bonding
connections, are proper (e.g.
connections are solid, conductor
cross-sections are sufficient).
X Error loop impedance (TN sys-
tem) or earth resistance (IT sys-
tem) satisfactory.
XI Automatic electrical protective
equipment set correctly (auto-
matic resets not possible).
XII Special operating conditions are
observed (PTC thermistor trig-
M8
M10
gering system in accordance
with Directive 2014/34/EC).
12
18
Test schedule
XIII All cables and lines that are not
being used are connected prop-
erly.
XIV Installation with changeable
voltage in agreement with the
documentation.
XV Electrical insulation clean/dry.
2. Fit terminal box cover for explosion protec-
tion. Make sure that there are no dirt particles
in the terminal box and on the ignition trans-
mission prevention passages and that the
connection surfaces are undamaged and
greased as specified (Installation instruc-
tions). Observe the tightening torques accord-
ing to the table (Electrically connecting the
unit).
18 Commissioning
18.1 Checks before commissioning
1. Perform the following checks: D = detailed
check, N = close inspection, S = visual in-
spection
Test schedule
I
No damage or unauthorised
changes on unit.
II Condition of terminal box seal
satisfactory. Ensure connections
are sealed.
III No evidence of water or dust en-
tering the housing in compliance
with the IP rating.
IV Encapsulated components un-
damaged.
V Impeller at sufficient distance
from housing (air gap).
D N S
VI Air flow not hampered. No for-
● ● ●
eign bodies in the air section.
VII Sealing of shafts, cables, ducts
and/or "lines" satisfactory.
VIII Duct system and transition to
mixed system undamaged.
● ● ●
IX Unit has sufficient protection
from corrosion, weather, vibra-
tion and other interfering factors.
X Accumulations of dust or dirt not
excessive.
● ● ●
18.2 Checking correct functioning
1. Switch on unit and perform the following
checks: D = detailed check, N = close inspec-
tion, S = visual inspection
Test schedule
I Direction of rotation / air flow dir-
ection.
II Ensure correct power consump-
● ● ●
tion The rating current (→ rating
plate) may be higher or lower de-
pending on local conditions (duct
distance, altitude, temperatures).
III Thermal safety is ensured by the
PTC thermistor triggering system.
19 Cleaning, maintenance
According to Directive 1999/92/EC, the work-
place and work equipment must be main-
tained with due regard to safety. The points
listed in EN 60079-17 must be taken into ac-
count and carried out.
The intervals should be determined by the oper-
ating company in accordance with EN 60079-17
and may be extended if a sufficient maintenance
concept is used – frequency depending on ambi-
D N S
● ●
D N S
● ● ●
● ● ●
● ● ●
● ● ●
● ● ●
D N S

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis