Herunterladen Inhalt Inhalt Diese Seite drucken

Switching On And Off; Grinding With The Grinding Disc; Tape Loops; Change Grinding Belt - Parkside PSBS 240 C2 Originalbetriebsanleitung

Stand-bandschleifer
Vorschau ausblenden Andere Handbücher für PSBS 240 C2:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 4
GB
IE
Keep your hands away from
the grinding disc and grind-
ing belt when the device is in
operation. Injury hazard!

Switching on and off

Ensure that the mains voltage
matches the specifi cations on the
rating plate.
Connect the equipment to the
mains.
1. To switch on, press the "I" On switch
and the device starts up (see
2. To switch off, press the "0" off switch
and the device switches off (see
14b).
After switching on the device, wait until the
device has reached its max. speed. Only
then must you start with the grinding.
The disk will continue to
run after the equipment is
switched off. There is a risk
of injury.
Test run:
Before starting work and after each
change of grinding disk, carry out a test
run of at least 60 seconds with no load.
Switch off the equipment immediately if the
disk runs lumpy, substantial vibrations oc-
cur, or abnormal noises are generated.
Grinding with the grinding
disc
Fold down the spark protec-
tor (
1) when grinding in
order to avoid injury from
sparks.
28
The arrow on the protective hood
(
tion of the grinding disc.
Place the workpiece on the workpiece
support (
its desired angle on the grinding disc
(
19).
Move the workpiece slightly from side
to side in order to achieve an optimal
grinding result. This way, the grinding
disc is worn uniformly. Occasionally, al-
low the workpiece to cool down.

Tape loops

14a).
The arrow on the protective hood
(
tion of the grinding belt.
Firmly hold the workpiece, do not exert
any strong force.
Move the workpiece slightly from side
to side in order to avoid a one-sided
wear of the grinding belt.
Always grind the pieces of wood in the
direction of the wood grain in order to
avoid chipping.

Change grinding belt

1. Loosen the 2 fi xing screws (11) and
hang out the grinding belt cover (12).
2. Press the clamping lever (7) downwards
and detract the grinding belt (10).
3. Place the new grinding belt (10) in the
centre on the upper (20a) and lower
(20b) rollers.
4. Push the clamping lever grinding belt
(7) and mount the grinding belt cover
(12).
Set the tape run:
5. The tape run accuracy is set by turning
the adjusting screw for belt run (8).
3) shows the direction of rota-
18) and slowly bring it to
9) shows the direction of rota-

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis