Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Prepare For The Installation In The Zaptec Portal - ZAPTEC Pro Kurzanleitung

Vorschau ausblenden Andere Handbücher für Pro:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 55
English

4 . Installation

Prepare for the installation in the ZAPTEC Portal

Only ZAPTEC installation technicians/service partners can add installations
in the ZAPTEC Portal cloud solution. New installation technicians/service
partners must contact ZAPTEC's technical support via support@zaptec.com
in order to have service authorisation added to their user profile. They will
then be able to add new installations.
Log on at https://portal.zaptec.com. If you wish to add a new ZAPTEC Portal
installation, go to Installations and fill in the form shown below:
• Name: Give the installation a name.
• Address: The address of the installation's physical location.
• Category: Select the installation category from the drop-down list.
• Network type: Choose the appropriate power grid for the location of the
charging system.
• Protection for charging system: The maximum current that the installation
can use for charging. This could be a digital budget or the value of the
physical overload protection or the power switch. If the charging station
is located on a separate circuit, the maximum current per phase must
normally be set to the rating of the circuit breaker.
Add charging circuits to the installation
• Once the installation has been set up, press the "Circuits" tab
• Click on "Add circuit"
• Enter the circuit designation stated in the fuse box
• State the value [A] for overload protection
Charging stations that receive power from this charging circuit can charge
up to the value of the charging circuit. It can therefore be an advantage not
to operate on full load.
8

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis