Herunterladen Inhalt Inhalt Diese Seite drucken

Checchi & Magli DUAL 12 GOLD Bedienungs- Und Wartungsanleitung Seite 88

Umpflanzmaschine
Vorschau ausblenden Andere Handbücher für DUAL 12 GOLD:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

Replacing the planting unit chain
E
F
UN41-0565BN
Proceed as outlined below.
1)
Loosen the screws (A) and remove the casing (B).
2)
Unscrew the nuts (C) and remove the casing (D).
3)
Unscrew the nuts (E) and remove the casing (F).
4)
Use the tensioner (G) to slacken the chain.
CAUTION
The tensioner could move unexpectedly, causing in-
jury to the hands.
Proceed with the utmost caution.
English language
INFORMATION CONCERNING REPLACEMENTS
5)
6)
7)
8)
NOTICE
Take special care to fit the link correctly and in the
direction indicated in the figure.
9)
10) Fit the casing (D) and tighten the nuts (C).
11) Fit the casing (B) and tighten the screws (A).
40
C
A
D
G
Remove the joining link (H).
Remove the chain from the pinions.
Fit the new chain on the pinions and on the chain
tensioner (G).
Fit the joining link (H).
Fit the casing (F) and tighten the nuts (E).
8
B
H
Use and maintenance

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis