Herunterladen Inhalt Inhalt Diese Seite drucken

Checchi & Magli DUAL 12 GOLD Bedienungs- Und Wartungsanleitung Seite 87

Umpflanzmaschine
Vorschau ausblenden Andere Handbücher für DUAL 12 GOLD:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

Replacing the driving wheels chain
E
C
D
UN41-0510MM
For this operation, proceed as outlined below.
1)
Move the lever (E) to lift the wheel in order to slack-
en off the chain.
2)
Loosen the knobs (A).
3)
Remove the casing (B).
4)
Loosen the knobs (C).
5)
Remove the casing (D).
6)
Move the tensioner (F) and remove the chain (G)
from the pinion.
CAUTION
The tensioner could move unexpectedly, causing in-
jury to the hands.
Proceed with the utmost caution.
English language
INFORMATION CONCERNING REPLACEMENTS
A
B
7)
NOTICE
Fit the chain with the joining link positioned as
shown in the figure.
8)
9)
10) Fit the casing (B).
11) Tighten the knobs (A).
Repeat the same procedure to replace the chain on the
other driving wheel.
39
F
Fit a new chain.
Fit the casing (D).
Tighten the knobs (C).
8
G
Use and maintenance

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis