Herunterladen Inhalt Inhalt Diese Seite drucken

Bosch Rexroth HD 2 Montageanleitung Seite 62

Hub-dreheinheit
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
24/38
Commissioning
Bosch Rexroth AG, MIT: HD 2, 3 842 358 735/2019-10
Life stages of the machine according to EN 12100 Sect. 5.4 a /b (No. 1- 27), Sect. 5.4 a
1
Transport, assembly and installation
2
Commissioning
3
Use
4
Disassembly, decommissioning and disposal
5
Setting up
6
Verifying
7
Teaching/programming
8
Changeover
9
Startup
10
All operating modes
11
Feeding the machine
12
Removing product from the machine
13
Shutting the machine down
14
Shutting the machine down in the case of an emergency
15
Restoring operation after a bottleneck or blockage
16
Restarting after unscheduled shutdown
17
Troubleshooting and remedial action (intervention by operating personnel)
18
Cleaning and keeping clean
19
Preventive maintenance
20
Corrective maintenance
Operating states of the machine, Sect. 5.4 b
21
Normal operation
22
Modifi cation of a property or a dimension of the material or workpiece to be
processed
23
Failure of one (or more) of its components or supply devices
24
External disturbances (e.g. impact, vibration, electromagnetic interference)
25
Design faults or defects (e.g. software errors)
26
Disruption in the power supply
27
Ambient conditions (e.g. damaged fl oors)

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis