Herunterladen Inhalt Inhalt Diese Seite drucken

Start-Up; Charging The Water In The Boiler; Adjustments - SM 100 Touch Serie Bedienungs- Und Wartungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 75

4. Start-up

• The coffee machine must be started by qualified technical personnel approved by La
San Marco.
• Once the electric and hydraulic connections are completed, the user is urged to start
the espresso coffee machine with the following procedure in order to avoid damaging
the appliance.

4.1 Charging the water in the boiler

1)
Check that the machine main switch 1 (figure 1) is in position 0 (zero).
2)
Remove the tray and the cup support grill and make sure that:
a) the boiler drain valve a is closed (figure 8).
b) the taps of the automatic level valve b-c must be open (figure 8).
c) MODELS 100 tOUCh: the taps for the volumetric counters e must be open (figure 10).
figure 8
a
b
3)
Open the water supply on-off valve.
Open a steaming tap 6 (figure 1) to allow the exit of the air in the boiler filling phase.
4)
5)
Reinstall the tray and cup support grill in its place.
6)
turn the knob of the main switch to position 1 so as to carry out automatic filling of the boiler with water.
In models100 Practical tOUCh, when water reaches the level probe, filling stops and the green "MAX"
LED of the electronic level control comes on. In other models of the 100 tOUCh series, when water rea-
ches the level probe, filling stops and the blue "OK" LED of the electronic level control comes on.
Note:
when the boiler is filled with water, it may take longer than 150 seconds, after which the automatic level alarm
trips (see the chapter on display of alarms). If this happens, turn the main switch to 0 (zero) and then back to
1. Then perform automatic filling of the boiler again (as described in point 6).
To keep the automatic level alarm from occurring, just speed up automatic filling of the boiler using the manual
filling button f (figure 8).
The main switch can be turned to two positions (1 and 2). Position 1 starts the electronic automatic
level function to fill the boiler and excludes the operation of the heating elements. Position 2 starts
the heating elements to heat the water. Never start the coffee machine by turning the main switch
to position 2 (in order to work, the heating elements must always be immersed in the water).

5. adjustments

Any adjustments to the coffee machine must be carried out by qualified and authorized staff from
LA SAN MARCO SPA.
c
f
e
d
figure 9
figure 10
35

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis