Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance Schedule En - Abicor Binzel CR1000 Betriebsanleitung

Vorschau ausblenden Andere Handbücher für CR1000:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

CR1000/CR1250
13.5 Maintenance schedule
No.
Maintenance
Maintenance work to be
interval
carried out
1
Weekly
Check coolant level
2
Monthly
Clean the finned radiator using
compressed air, removing all dust
3
Monthly
Check the coolant supply and return
hoses for dirt, replace if necessary
4
Every six months
Change the coolant
5
Every six months
Flush the finned radiator against the
direction of supply/return flow
6
Every six months
Flush the coolant container
7
Every six months
Check the tightness of the connectors;
if necessary, tighten hose clamps using
pliers
8
Annually
Inspection and testing during
operation
Tab. 12
Maintenance schedule
BAL.0351.0 • 2018-08-15
Maintenance schedule
Carried out
on
13 Appendix
Signature/comment Next
maintenance
EN - 25

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Cr1250

Inhaltsverzeichnis