8.3 PRECAUTIONS DURING STORAGE

1. The pump body may fracture if the water inside freezes; insulate the pump or remove
all the water from the inside.
2. If you have any spare pumps, you must perform test runs on them on a regular basis
and keep them ready for use at all times.
3. When a pump remains off for a long period of time, you must take great care to
prevent any oxidation on the surface of the bearing, shaft, coupling, etc. The gasket
may also become mouldy. To avoid this, remove the gasket, dry it and grease it and
then put it back in its position.

8.4 REPLACING PARTS

Replace worn parts according to the following table:
Piece
Mechanical seal
Soft shaft seal
Rolling bearings
Pump body O-ring
Coupling rubber parts
This replacement period is an average and refers to normal operating conditions.
The table, below, shows the number and size of the parts to be replaced, according to
the model of the pump:
Pump model Bearings (x2)
32-125.1
6306ZZ
32-125
6306ZZ
32-160.1
6306ZZ
32-160
6306ZZ
32-200.1
6306ZZ
Status
Water leakage
It becomes impossible to
control water dripping
Excessive noise or vibration
After every dismantling
As soon as any signs of
damage appear
Mechanical seal*
(shaft diameter in
mm)
28
28
28
28
28
Replacement period
Yearly
Yearly
Every 2 or 3 years
---
Yearly
Soft shaft seal:
Gasket rings (x4)
33 x 49 x 8
33 x 49 x 8
33 x 49 x 8
33 x 49 x 8
33 x 49 x 8
EN
Gasket unit
(x1)
3.53 x 183.74
3.53 x 183.74
3.53 x 183.74
3.53 x 183.74
3.53 x 234.54
17