Herunterladen Inhalt Inhalt Diese Seite drucken

6.3.3.3 Pipe And Hose Connection With Attachment Nipple And Hose Clamp - ECOLAB EcoPro Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 4
Assembly, installation, modification and upgrades

6.3.3.3 Pipe and hose connection with attachment nipple and hose clamp

Fig. 12: Pipe and hose connection with attachment nipple and hose clamp
A
Detail/Section: Illustration of individual part
1
Hose
2
Union nut
3
Tapered part
4
O-ring
1.
Cut hose (1) straight.
2.
Push the union nut (2) and clamp it over the hose (1).
3.
Push the hose clamp (6) over the hose (1).
4.
Push the hose (1) onto tapered part (3) up to the stop collar (detail A1).
5.
Place the O-ring (4) in the groove of the suction or pressure valve (5).
6.
Tighten the union nut (2) (detail B1).
7.
Push the hose clamp (6) downward and tighten (detail B1).
417102264 Rev. 5-01.2019
5
Suction valve, pressure valve
6
Hose clamp
A1 Pipe or hose attached
B1 Valve connection: Target state after assembly
40

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis