Maintenance
9.9

Pump head size 120 l/h

Fig. 23: Replacing the pump head and diaphragm
A
Adhesive label: Tightening torque of metering head
screws
1
Metering head screws (4 off)
2
Pump head
3
Diaphragm
4
Intermediate plate.
Note the following points during assembly:
– Fit new protective diaphragm in the correct positions.
– Place in the intermediate plate in the correct position.
– Turn the adapter plate clockwise until the diaphragm rupture drain faces
down.
– Mount the pump head and pay attention to the direction of flow
– Hand-tighten the pump head screws and then tighten them cross-wise.
– Prior to start-up and after 24 hours of operation, the metering head screws
must be diagonally tightened diagonally.
– It is not permitted to exceed the tightening torque to avoid damage to the
thread. If the tightening torque is undershot, this can result in leaks.
Tightening torques, see
1.
Loosen the metering head screws (pos. 1).
2.
Remove the pump head (pos. 2).
3.
Take out diaphragm (3) and intermediate plate (4).
4.
Unfasten retaining bolts for the adapter plate (5).
5.
Remove adapter plate (6a or 6b).
6.
Remove the protective diaphragm (8) from the diaphragm extension (7).
7.
Remove the diaphragm extension (7) from the plunger.
8.
Reverse this procedure for re-installation.
417102264 Rev. 5-01.2019
5
Retaining bolts for the adapter plate (x4)
6a Adapter plate without sensor
6b Adapter plate with sensor
7
Diaphragm extension
8
Protective diaphragms
Ä Chapter 13.6 'Tightening torques' on page 78