Herunterladen Inhalt Inhalt Diese Seite drucken

Hose Connection - ECOLAB Elados EMP E60 serie Kurz- Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Device installation
4.1.3
Hydraulic Connections - EMP III
1
2
3
4
5
6
P
S
7
5
4
3
2
1
4.1.4
Hydraulic Connections - EMP IV

Hose connection

MAN033535 Rev. 06-04.2020
1
Metering hole
2
Union nut
3
Clamping piece
4
Tapered part
5
O-ring
6
Pressure valve
7
Suction valve
P
Pressure side
S
Suction side
n
Trim the hose to the precise length.
Slide the union nut (pos. 2) and Clamping piece (pos. 3) over the hose and
n
attach the hose to the tapered part up to the stop collar (pos. 4).
n
Insert the O-ring (pos. 5) into the valve groove and tighten the union nut.
1
1
Hose
2
2
Hose clamp
3
Union nut
4
Hose nipple with insertion part (welded)
5
O-ring
3
n
Trim the hose (pos. 1) to the precise length.
n
Place O-ring (pos. 5) into groove of suction/pressure valve.
4
n
Tighten up hose nipple (pos. 4) with union nut (pos. 3).
n
Push hose clamp (pos. 2) over hose. (2 pieces recommended).
5
n
Push hose over hose nipple (here, it can be necessary to pre-heat the hose in
hot water).
n
Tighten up hose clamps.
12

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis