Herunterladen Inhalt Inhalt Diese Seite drucken

Connecting The Suction Pipe And Pressure Pipe; Suction And Metering Line Connection With Hose Nipple; Suction And Metering Line Connection With Insertion Part In Case Of Permanent Tubing; Suction And Metering Line Connection With Tapered Part - ECOLAB Elados EMP IV E00 Betriebsanleitung

Membrandosierpumpe
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

6.2

Connecting the suction pipe and pressure pipe

When connecting the suction and pressure pipes, ensure that the O-rings are fixed to the
CAUTION
connectors so as to achieve the required seal.
NOTE
The use of an appropriate suction pipe from our product range is recommended.
6.2.1

Suction and metering line connection with hose nipple

Fig. 6.10
6.2.2

Suction and metering line connection with insertion part in case of permanent tubing

If the metering line is laid in an inflexible manner, a pulsation attenuator has to be installed
NOTE
in order to avoid pressure strokes
Fig. 6.11
6.2.3

Suction and metering line connection with tapered part

NOTE
This type of connection is available only for 1¼"-valves.
Fig. 6.12
417101090_EMP_IV_E00_E10
All manuals and user guides at all-guides.com
Pos.
Description
1
Hose
2
Hose clamp
3
Union nut
4
Hose nipple with insertion part (welded)
5
O-ring
 Cut off hose cleanly.
 Place O-ring into groove of suction/pressure valve.
 Tighten up hose nipple with union nut.
 Push hose clamp over hose. (2 pieces recommended)
Push hose over hose nipple and tighten up hose clamps. (Arrangement
of hose clamps according to Fig. 6.10.)
Pos.
Description
1
Tube
2
Union nut
3
Insertion part
4
O-ring
 Cut off tube cleanly and remove burrs.
 Push union nut over tube.
 Weld tube and insertion part together.
 Place O-ring into groove of suction/pressure valve.
Push union nut over insertion part and tighten it up.
Pos.
Description
1
Hose
2
Union nut
3
Clamping piece
4
Tapered part
5
O-ring
 Cut off hose cleanly.
 Push union nut and clamping piece over hose.
 Push hose onto connection nipple as far as tapered part
 Move clamping piece into direction of tapered part until you feel
resistance.
 Place O-ring into groove of suction/pressure valve.
Tighten up union nut.
- 42 -
Rev. 8-06.13

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Elados emp iv e10

Inhaltsverzeichnis