Herunterladen Inhalt Inhalt Diese Seite drucken

Suzuki RV125K3 Montageanleitung Seite 6

Inhaltsverzeichnis

Werbung

Before assembling the motorcycle, thoroughly
understand the "Safety Check Out" described on
page 52. After completion of assembly, carefully
check the motorcycle referring to the "Safety
Check Out", then deliver the motorcycle to the
customer.
ASSEMBLY
REMOVING THE BRACKET
Loosen the front brake master cylinder bolts and
remove the master cylinder from the bracket.
Keep the position of front brake master cylin-
der with its cap facing upwards until it is
installed.
A: Master cylinder
B: Bolt
C: Bracket
Remove the bracket from the handlebar mounting
position.
Be careful not to scratch the fuel tank.
NOTE:
The bracket and bolts are no longer needed
and these may be discarded.
A: Bracket
B: Bolt
HANDLEBARS
Loosen the throttle housing retaining screws. Insert
the throttle assembly and master cylinder onto the
handlebars.
A: Throttle assembly
B: Handlebars
C: Master cylinder
5

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis