Herunterladen Inhalt Inhalt Diese Seite drucken

Suzuki RV125K3 Montageanleitung Seite 32

Inhaltsverzeichnis

Werbung

With just enough force to break the nozzle seal of
electrolyte container, push each nozzle of the electro-
lyte container into the battery's electrolyte filler ports
and hold the container firmly so that it does not fall.
Take precaution not to allow any of the fluid to spill.
A: Electrolyte containers
Make sure air bubbles are coming up in each electro-
lyte container, and leave in this position for about 20
minutes.
A: Air bubbles
NOTE:
If no air bubbles are coming up from a filler
port, tap the bottom of the container two or
three times. Never remove the container from
the battery.
After confirming that the electrolyte has entered the
battery completely, remove the electrolyte containers
from the battery. Wait for around 20 minutes.
Insert the caps into the filler holes, pressing in firmly
so that the top of the each caps does not protrude
above the upper surface of the battery's top cover.
A: Caps
Never use anything except the specified bat-
tery electrolyte.
Once the sealing cap has been installed in the
battery, do not remove the sealing cap.
31

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis