Herunterladen Inhalt Inhalt Diese Seite drucken

Suzuki RV125K3 Montageanleitung Seite 3

Inhaltsverzeichnis

Werbung

Item
Part Name
Handlebars assembly
Clamp
Flange bolt
Burring washer
Strap
A
Clutch lever cover
Left switch holder set
Screw
Screw
Handlebar balancer weight
Screw
B
Flange nut
Rubber cushion
Flange nut
C
Rear view mirror
Front fender
D
Flange stepped bolt
NOTE:
The parts shown as Item I and J in the above table are supplied for limited markets.
Parts listed above are installed respectively into the positions as follows.
D
C
E
A
Q'ty
Remarks
1
2
4
8 × 40 mm
4
OD:13.0 ID:8.5
2
L:140
1
1
5 × 25 mm
2
For left switch
5 × 30 mm
1
For throttle assembly
1
1
6 × 60 mm
1
8 mm
1
1
6 mm
2
Right and Left
1
4
6 × 16 mm
Item
Part Name
Front brake hose guide
D
Speedometer cable guide
E
Front wheel assembly
F
Front wheel spacer
G
Stepped screw
Rear muffler cover
H
Stepped screw
I
Warning label
J
Warning label
Battery electrolyte
K
container
L
Owner's manual
T
L
OD ID
G H
The photograph shown indicates the parts dis-
mounted from the motorcycle in addition to the items
listed above.
A: Front brake master cylinder
B: Throttle assembly
C: Clutch cable
D: Left switch
E: Front turn signal light assembly (Left)
F: Front turn signal light assembly (Right)
G: Speedometer drive gearbox
H: Rear turn signal light assembly (Right)
2
Q'ty
Remarks
1
1
1
1
6 × 9 mm
1
For rear turn signal
1
2
6 × 12 mm
7
For CC selection
4
For CD selection
1
1
OD : Outside diameter (mm)
ID : Inside diameter (mm)
L : Length (mm)
T : Thickness (mm)
B
C
F

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis