2. Installation
2.5 Installation depending on the system earthing arrangement (SEA)
EX RT must be fed from a 3-phase source with neutral.
UPS with common Normal and Bypass AC inputs
Main
low-voltage
switchboard
(MLVS)
Changement de SLT entre amont et aval ou isolation galvanique requis
Main
low-voltage
switchboard
(MLVS)
ASI avec réseaux d'entrée AC Normal et AC Bypass séparés
Main
low-voltage
switchboard
(MLVS)
Changement de SLT entre amont et aval ou isolation galvanique requis
Main
low-voltage
switchboard
(MLVS)
(*): The transformer is not necessary if:
Normal and Bypass AC inputs are connected to the same source,
z
and wires cross sections and wires lengths on Normal and Bypass inputs are identical,
z
and upstream protection is provided by only one switch with RCD (residual current device) for Normal
z
and Bypass inputs.
Page 18 - 34007724EN/AD
11
Bypass AC
Normal AC
10
Bypass AC
11
10
Normal AC
Bypass AC
11
(*)
10
Normal AC
Bypass AC
11
(*)
10
Normal AC
8
8
8
8
load
load
load
load