Assembly, initial commissioning
7
Assembly, initial commissioning
7.1
Safety and security
7.2
Assembly
The complete assembly and initial commissioning is carried out exclusively by the
manufacturer. The machines are subjected to an extensive test run and only deliv-
ered after the successful approval.
7.3
Initial commissioning
26
In order to guarantee the safety of human and machine, the
simple
and
risk-minimising
considered as early as during the design. The handling
device is therefore subject to applicable DIN EN standards.
Operator training and instructions are required and further
reduce the safety risk.
Before initial commissioning, check the entire vehicle for
damage.
assembly/handling
was