Herunterladen Diese Seite drucken

Profitec GO Bedienungsanleitung Seite 25

Vorschau ausblenden Andere Handbücher für GO:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5
FIRST USE
Read the instruction manual carefully prior to operating the machine.
Prior to starting the machine, check if:
• the steam valve is closed.
• the switch and buttons are not activated.
• the power cord is disconnected.
• the drip tray is inserted correctly.
• the machine is placed on a water resistant surface.
Now you can begin to operate your machine:
1
Remove the water tank lid.
2
Fill the water tank with fresh water, preferably low in lime. Replace the water tank lid.
3
Insert the power plug into the wall socket and press the power-switch. The machine is now on.
Important!
For the initial set-up the boiler has to be filled, by pressing the switch for coffee.
Fill Mode
When using the machine for the first time, it will be in fill mode, with "FIL" displayed on the PID. Place a small
container (e. g. a. milk jug) under the brew group. Press the coffee button and the pump will begin to fill the
boiler and the shot counter will begin. Wait until the shot counter has reached at least 30 and water is being
dispensed from the brew group before pressing the coffee button again to stop filling the boiler. The
indication "FIL" in the display should have disappeared.
4
The machine will now heat up. The PID display shows the boiler temperature or UP. The pump
pressure gauge may deflect during the heating phase. Please note that this deflection is not relevant
to the process and can be disregarded. Continue reading under chapter "6.1".
Before preparing the first coffee, please clean the machine by extracting about 2-3 water
tank fillings from the brew group.
Important!
The PID-control assists the machine in keeping a constant boiler temperature. This
means that the machine constantly regulates the temperature and the small dot in the
PID display flashes for one heating interval at a time. The boiler temperature is indicated
on the PID-display.
Make sure that there is always enough water in the water tank during operation.
If there is no water in the tank, the machine draws air and a loud pumping noise can be
heard. If the pump does not draw water after filling, switch off the machine and let it cool
down before switching it on again.
6
USE OF THE MACHINE
6.1 Preparation of the machine
The switched off machine is to be placed into operation as follows:
1
Make sure that there is sufficient water in the water tank. Refill water if necessary.
2
Turn on the machine. If the boiler temperature is below 40°C when the machine is switched on, the
display will show "UP" and the machine will start in Fast Heat Up mode.
3
Make sure the portafilter is clamped into the brew group.
4
The machine is heated up as soon as the desired preset temperature appears on the PID display or
the display shows FLU.
The heating period depends on the ambient and water temperature and is approx. 6:30 minutes in
machines with 230 V and 8:30 minutes in machines with 120 V.
Translation of the original German user manual
ENGLISH
24

Werbung

loading