07 - Connection to energy management
systems
Duo can be configured to operate with Power Manager, an optional device that allows the charger to dynamically adjust
the power dedicated to charging, ensuring that the contracted power limit of the meter is not exceeded, thus preventing
disconnections from the grid. This device is also compatible with systems that have photovoltaic production. The single-
phase version of Power Manager can only be installed in single-phase systems, and similarly, the three-phase version is for
three-phase systems.
Note: The installation of Power Manager is not required for the operation of Duo, but without it, the charger can only be
configured in "fixed power" mode.
07.1 - Power Manager
C
07.2 - Load Balancing
In cases of installing multiple Duo units or other Daze chargers under a single meter, the Load Balancing feature allows the
chargers to distribute the allocated power across the vehicles being charged, ensuring that the total power limit set via the App
is not exceeded.
Router
D
14.
Duo
Duo
master
slave
After passing the Power Manager cable through
the designated cable gland as previously
indicated, proceed with crimping the RJ45
connector and connecting it to the appropriate
socket as shown in figure (C).
For more information on the installation of the
Power Manager, refer to the device manual
included in the package or available for
download from the website www.daze.eu. The
configuration of the Power Manager should be
done through the App (see chapter 08).