The other connections for additional functionalities are shown in figure (B):
B
12.
3P
For a three-phase Duo installation, connect line
1 (L1), line 2 (L2), line 3 (L3), neutral (N), and earth
(PE) to the spring terminals as indicated on the
board.
Note: In case of Load Balancing installation
across multiple chargers, it is recommended
to alternate the position of the L1, L2, and L3
lines among the chargers to avoid current
imbalances between the phases.
A. Clean contacts
B. RJ45 for Power Manager
C. USB port dedicated to the
4G module
D. RJ45 for Ethernet (Input)
E. RJ45 for Ethernet (Output)
F. Switches for setting nominal
current