Note
After installation, fill in the attached
"Test book"
form.
This information will be required in the event of servicing.
2.10
Before commissioning
Warning
Before commissioning, check all fastening screws, electrical, pneumatic and hydraulic lines
and tighten them if necessary.
Caution: Some of these must be checked at regular intervals and retightened if necessary.
® Copyright ATH-Heinl GmbH & Co. KG / All rights reserved / Misprints and technical changes reserved
131
Release date: 26.01.2024 / Product manufacturer ATH-Heinl GmbH & Co. KG