Herunterladen Diese Seite drucken

ATH-Heinl Matrix Lift 2.65 Bedienungsanleitung Seite 113

2-säulen-hebebühne

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
1
3
Raising the posts
Snap ring D.8
Washer D.8
Crossbar
Slide the center piece of the crossbar into the already mounted column elevations.
Connect everything with the accessories supplied. Do not tighten the screws yet!
Adjust the width of the cross bar taking into account the column installation angle and tighten the screws
of the cross bar.
3. Before anchoring with the dowels, make sure that the two lifting columns are aligned in both directions as
indicated below; if necessary, align with washers or shims.
® Copyright ATH-Heinl GmbH & Co. KG / All rights reserved / Misprints and technical changes reserved
2
4
7
5
6
Release date: 26.01.2024 / Product manufacturer ATH-Heinl GmbH & Co. KG
Nut M8
Washer D.8
M8x25 bolt
113

Werbung

loading

Diese Anleitung auch für:

Matrix lift 2.75xl