Herunterladen Diese Seite drucken

ATH-Heinl Matrix Lift 2.65 Bedienungsanleitung Seite 124

2-säulen-hebebühne

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Connecting the hydraulic hose of the main column A
A
1. Connect the hydraulic hose to the top of the main column cylinder.
2. Check that the two connections on the cylinder and on the power unit are properly seated to prevent leaks.
Connecting the hydraulic hose of the secondary column B
B
1. Route the hydraulic hose from the power unit, on the main column upwards, over the crossbar to the
cylinder of the secondary column.
2. Connect the hose to the top of the secondary column cylinder.
3. Check that the two connections on the cylinder and on the power unit are properly seated to prevent leaks.
4. Check that the hose is laid correctly to avoid damage.
® Copyright ATH-Heinl GmbH & Co. KG / All rights reserved / Misprints and technical changes reserved
124
Release date: 26.01.2024 / Product manufacturer ATH-Heinl GmbH & Co. KG

Werbung

loading

Diese Anleitung auch für:

Matrix lift 2.75xl