Herunterladen Diese Seite drucken

ATH-Heinl Matrix Lift 2.65 Bedienungsanleitung Seite 123

2-säulen-hebebühne

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Note
Pay attention to possible soiling of the hydraulic components and remove this if necessary
before installation.
Attention
To prevent hydraulic oil from escaping, ensure that the hose connections are neither too loose
nor too tight.
1
Control valve cylinder column B
Hydraulic hose for column B 3/8"
Return line
Control valve for column B power pack
1. Clean any dirty hoses and connections.
2. Check all threads and hose connections for damage.
3. Lay the hoses as shown in the diagram.
4. Tighten the hose connections carefully.
® Copyright ATH-Heinl GmbH & Co. KG / All rights reserved / Misprints and technical changes reserved
2
5
Release date: 26.01.2024 / Product manufacturer ATH-Heinl GmbH & Co. KG
3
4
6
Control valve cylinder column A
Hydraulic hose for column A 1/4"
Control valve power pack column A
7
123

Werbung

loading

Diese Anleitung auch für:

Matrix lift 2.75xl