Herunterladen Diese Seite drucken

ATH-Heinl Matrix Lift 2.65 Bedienungsanleitung Seite 120

2-säulen-hebebühne

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Drill the holes with a D.18 percussion drill, 240 mm deep. Take care not to ream the hole to ensure the
maximum holding force of the anchors.
Clean each hole thoroughly with compressed air or a wire brush to remove dust. Take care not to move
the pillars in the process.
Fill the drill holes with adhesive.
Fit the washers and nuts to the anchor rods.
Insert the anchor rods into the holes filled with adhesive.
Check that the column is plumb.
a
b
a < 10mm
b < 10mm
If it is necessary to align the column, place the U-plates in the appropriate places under the base plate.
Once the column is aligned, screw the anchors in place.
Repeat the process for the 2nd column.
® Copyright ATH-Heinl GmbH & Co. KG / All rights reserved / Misprints and technical changes reserved
120
e
c
d
f
e < // 1 3,6mm
c < 10mm
d < 10mm
f < // 1 3,6mm
Release date: 26.01.2024 / Product manufacturer ATH-Heinl GmbH & Co. KG

Werbung

loading

Diese Anleitung auch für:

Matrix lift 2.75xl