Herunterladen Diese Seite drucken

ATH-Heinl Matrix Lift 2.65 Bedienungsanleitung Seite 118

2-säulen-hebebühne

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Screw one part of the crossbar at a time to the column elevations using the accessories supplied (nuts
M12, washers D.12 and screws M12x40).
Do not tighten the screws yet!
Insert the two parts of the crossbar into each other and screw the parts together (nuts M12, washers D.12
and screws M12x40).
3. Set up the columns with the pre-assembled crossbar.
4. Align the two lifting columns in both directions as indicated below, using washers or shims to compensate if
necessary.
® Copyright ATH-Heinl GmbH & Co. KG / All rights reserved / Misprints and technical changes reserved
118
Release date: 26.01.2024 / Product manufacturer ATH-Heinl GmbH & Co. KG

Werbung

loading

Diese Anleitung auch für:

Matrix lift 2.75xl