Herunterladen Diese Seite drucken

ATH-Heinl Matrix Lift 2.65 Bedienungsanleitung Seite 109

2-säulen-hebebühne

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Note
It is also possible to contaminate the system by refilling it with oil
The minimum requirement and minimum oil quantity must be checked or produced.
2.9
Assembly
Note
These instructions are not to be regarded as assembly instructions; they only provide
information and assistance for competent and skilled fitters.
Warning
Appropriate clothing and individual protective equipment must be worn for the following work.
Caution
Incorrect assembly and settings will result in exclusion of liability and warranty.
Partially pre-assembled machines must be inspected, instructed and accepted by a competent person before
commissioning.
Assembly of machines must be carried out by a skilled and qualified person.
2.9.1
Foundation plan
Attention
Do not install the lift on asphalt or soft screed. There must be no expansion joints or cracks
that would interrupt the continuity of the reinforcement. The load-bearing capacity of
suspended ceilings must be checked by the operator.
The function of the lifting platform may be impaired if it stands at an angle.
Observe the specified concrete quality and hardening time
Concrete quality
Hardening time of concrete
® Copyright ATH-Heinl GmbH & Co. KG / All rights reserved / Misprints and technical changes reserved
Release date: 26.01.2024 / Product manufacturer ATH-Heinl GmbH & Co. KG
C25/30
Min. 20 days
109

Werbung

loading

Diese Anleitung auch für:

Matrix lift 2.75xl