Fig. 11
Fig. 12
Fig. 13
Fig. 14
8
Flexsafe
®
3D System 100L, 200L, 500L Instructions for Use
8. Remove the reversible cable tie on the bottom line (see Fig. 11).
9. To position the bag inside the Palletank
− Hold the folded bag on both arms with the 4-port system uppermost, facing
the user and the single (bottom) port underneath
− Position yourself on the side of the Palletank
If you are using the Palletank
y
y
− Insert the folded bag in the Palletank
the bottom port is positioned towards the bottom gate.
If you are using any other Palletank
y
y
the Palletank
in such a way that the bottom port is positioned towards the
®
bottom gate.
10. Insertion of the bottom port tube in the bottom gate:
− Carefully feed the bottom drain line through the Palletank
two hands to ensure the line does not reach the floor.
− Maneuver the bag bottom port so that the groove in the bottom port is
inserted with the fixed portion of the bottom gate. (see Fig. 13).
− While holding the bottom port firmly, close the mobile jaw of the gate. Ensure
that the groove of the bottom port is captured by both halves of the gate to
prevent movement of the bottom port during filling. (see Fig. 14).
− Latch the bottom gate to secure the bottom port within the gate.
− The port should be snug in the gate and not have room for movement. Check
that the bottom port is properly seated in the bottom gate by firmly but
gently tugging on the bottom port and checking for movement. If the bottom
port appears to have freedom of movement, repeat step 10.
11. Unfold the bag and drape the 4-port system and the top tubing onto the
Palletank
front wall.
®
®
(see Fig. 12):
closest to the bottom gate
®
for In-Process Fluid Handling
®
®
by the front opening in such a way that
, insert the folded bag by the top of
®
bottom gate using
®